Montarville North Trade Point
Phases I and II (Boucherville borough), Longueuil
The project’s main objective was to provide services to a new commercial zone of major importance located at a strategic intersection of Boucherville (Autoroute 20 and De Montarville Boulevard). This project included the design and the implementation of municipal services as well as the widening of some roads. The work consisted of the installation of water mains as well as sanitary and storm sewers. The project also included the design of a retention basin, the construction of underground ducts for public utilities, street lighting and the installation of synchronized traffic lights adaptable on demand (based on the installation of photoelectric sensitive cells making it possible to adjust the duration of the traffic lights to the number of cars and the length of the line of waiting cars on the Autoroute 20 exit lane).
Unique aspects
Several preventive measures had to be taken during this project to limit impacts on traffic flow and the residents (dust, noise) and this, in tight collaboration with public safety.
Services provided
-
Preparation of plans and specifications, cost estimates, technical reports and other documents relating to the project;
-
Preparation of the application for an authorization certificate for submission to the Ministère de l’Environnement;
-
Preparation of the call for tender documents;
-
-
Services during construction.
|