Energy

Automation and control of energy consumption at the National Metal Industries plant, Cairo, Egypt - Implementation of an energy control system in the form of a programmable controller system, enabling the acquisition of relevant data and measurements, and the ability to  shed the loads automatically so as to eliminate over consumption  and maximize production while reducing the plant’s average consumption.

 

Automation of the Delta Steel Mills plant, Cairo, Egypt - Implementation of an energy control system in the form of a programmable controller system, enabling the acquisition of relevant data and measurements, and the ability to shed the loads automatically so as to eliminate over consumption and maximize production while reducing the plant’s average consumption.

 

Modernization of the system control centre, Egesur, Peru - Definition study, development of the system architecture, feasibility study of an energy management system, and preparation of cost estimates.

 

Activation, Delta Steel Mills foundry, Cairo, Egypt - Activation of an energy management system based on programmable logic controllers (PLCs) to centralize and constantly control the overall electrical call of the foundry. The system is used to distribute the call between two electrical sources. It also serves to offload the appropriate furnaces to reduce the call points and thereby raise the foundry’s profitability.

 

SCADA power plant production system, Egesur, Peru - Concept study, preparation of technical specifications and cost estimates for a new SCADA system controlling the Aricota power plant.

 

Regional control centre and SCADA, Etecen, Peru - Feasibility study to implement a regional control centre for the transportation and energy distribution sectors. This control centre must acquire information from all the substations in the system and link it with the national load-dispatching centre. The study must define the needs in infrastructure required for the new regional control centre, including needs in telecommunications, the choice of desirable technology, the scheduling of tasks to be performed so as to limit the impact on operations, and an evaluation of the costs.

 

SCADA system, Etesur, Peru - As part of the modernization project of the supervision and control system of the transmission line, preparation of technical advice and concept study.

 

ABB Canada Inc/Aluminerie Alouette inc. - Addition of a remote control, telemetry and remote signalling system by programmable controller. Addition to the real time control (level I) of management and technical follow-up functions from the electrical sector (level II) and advanced power control software.

 