Careers | Contact us | Site map | Home
keywords in:
Verreault joins Dessau, 06/19/2008
Dessau President and Chief Executive Officer, Mr. Jean-Pierre Sauriol, and the President of Verreault, Mr. Michel Verreault, are proud to announce today that they are uniting their companies to create one of Canada’s largest engineering-construction groups.
More details
See all
Enlargement to RTL exploitation centres

The enlargement and modifications to the exploitation centres aim to increase the capacity to put away vehicles in the exploitation centre of Longueuil and the reorganization of the put away workshop and administration areas of Longueuil and St-Hubert centres.

 

The project management approach for this project is based on the  Project Management Body of Knowledge (PMBoK 2000) from the Project Management Institute (PMI®). This methodology ensures consistent quality in every aspect of  project management: project scope, schedule management, budget management and control just to name a few.

Once again, the PMI® methodology was followed.

 

Since many disciplines were involved, the coordination aspect was another major issue. An engineering coordinator was put in place to ensure the Client that the project is conducted in an efficient and proper manner.

 

In order to respect the initial budget, a tight cost control system was implemented and monitored during all the phases.

 

This system includes the update of cost estimates, the cash flow analysis, the preparation of cost control reports and the review of submissions and trade breakdowns.

 

Services provided

  • Project Management for the engineering, construction and  service set up stages.
  • Engineering : mechanical (ventilation, plumbing, gas  products, fire protection), electrical, civil, structure, architecture
  • Works surveillance
  • Workshop inspection